Tell me about how skyscraper's come into existence from beginning to end

tell me about how skyscraper's come into existence from beginning to end

Attached: Willis_Tower_From_Lake.jpg (800x1183, 209.33K)

They built them

Then the slowly turn into thermite.

>Willis Tower
No. Fuck you. I'll never call it that. Ever. Eat shit.

Horizontal space inefficient. Vertical more space efficient. Human make vertical building. Tall and big.

skyscrapers don't exist, op, they're painted on the walls like the background environments in old movies like star wars. green screen tech doesn't exist in irl flat earth.

You have to pay a bunch of construction workers to work on the building which is why not a lot of people build them anymore. The construction workers caste has lost all sense of servility owed to their station and needs to be crushed before we can resume building good skyscrapers again.

Chicago has so much fucking construction going on and they’re starting to build a new billion dollar river walk and casino.
>recession

step 1 design all supports to collapse simultaneously in the event of a terrorist attack

Basically a dick measuring contest.

first they put in concrete footings
then they put in steel columns and beams
then they pour concrete floor slabs
then they build interior walls and such, do plumbing, electrical, hvac, elevators etc
then they do finish architectural work like cabinets and doors and carpets
and wallah, a building

Attached: mw.webm (640x480, 405.74K)

>prefers the name of a defunct retailer
it is you that is the shit eater

WTF IS THAT REAL

completed contract accounting is a fucking NIGHTMARE

Attached: 1655180167158.png (666x501, 43.04K)

chicago is going to hell as big companies keep leaving the state

Broadly speaking:
Zoning/use studies main design architect/engineer for foundation excavation super-structure decking structural slabs elevator cores and exterior freight cars and cranes, glazing/skin to seal/weather tight the building as you bring in base building lighting/FA/MEP/Sprinkler systems and service equipment white box tenant fitouts on floors (businesses renting floors/units bring in their own design team for fitout) and base building lobby and exterior courtyard finishes.

>get tax payer money
>use 5% of it to show something to the community
>don't know where to get the rest of the funding to supply the next 50 years of that project in development
>people pocket the money while the project is just based on hopes and promises

Black people built them

People ashamed of smol D
-the end-

>ARABS fly planes into buildings

>AMERICANS fly buildings into planes

Attached: 1649820689544.jpg (477x518, 72.19K)